Production Line Engineering

From Line Planning to Production Start

A production line has to make the right product at the planned capacity and quality. We plan and deliver production lines for electric vehicles, batteries and related products, covering process layout, equipment selection and supply, tooling and control integration, installation, commissioning and handover. Projects can start with a new line or focus on expanding, adapting, relocating or improving an existing one.

Where We Can Help

Planning a New Line

You are setting up a new facility and need the line planned, from product and process inputs to station layout, equipment and interfaces.

Adding Capacity or Models

You need more output or new models on an existing line, with changeovers fitted into short shutdown windows.

Relocating or Going Overseas

You are moving a line or setting one up at an overseas site, where delivery, installation and production schedules have to be coordinated.

Improving an Existing Line

You want to remove bottlenecks or improve how an existing line runs.

What We Do

We cover every stage of a line, from the first layout to the start of production.

Planning and Design

We define the product, capacity, line speed, process flow, layout, key equipment and site requirements, and check the interfaces with material handling, controls, data and energy systems. The result is a concept for a new line or a retrofit, with a phased implementation plan. For overseas sites, the plan covers local mains voltage and frequency, earthing, language and certification requirements.

Integration and Commissioning

We integrate cycling, electrical testing, leak testing, fixtures and automation with the rest of the line’s equipment. Depending on the scope, we design, manufacture or procure the equipment, then install, wire, configure and commission it, including the interfaces with neighboring processes.

Acceptance and Handover

We run factory and site acceptance tests against the technical agreement, resolve open issues, train your team and hand over the documentation. We then support trial runs and the start of production.

What You Receive

How a Project Runs

You can engage us for planning only, or for the complete line from design to handover.

01
Requirements
We record your requirements item by item, with open points marked rather than assumed.
02
Design and Technical Agreement
We prepare the technical proposal and schedule, then sign a technical agreement covering test items, accuracy, cycle time, interfaces, acceptance criteria and responsibilities.
03
Proof of Concept
We share datasheets, drawings and sample test reports, with a remote or on-site demonstration. Batch manufacturing starts only after your written approval.
04
Manufacturing and Factory Acceptance
We manufacture the equipment under ISO 9001 process control and test it at our factory (FAT) before shipment. You can witness the test on site or by video.
05
Installation and Commissioning
We install and commission the equipment on site under your safety rules and sign off the site acceptance test (SAT).
06
Training and Handover
We train your team in the classroom and on the equipment, with English materials, hand over the documentation and spares, and support the start of production.

Testing Built into the Line

Because we also make production line test equipment, testing is planned into the line from the start. Electrical safety, function, communication and leak tests, and the fixtures and software behind them, are integrated with the rest of the line and commissioned together.

Projects

Battery Manufacturer · North America

Challenge

A new overseas production line and a test platform upgrade had to progress together while meeting local equipment, electrical and English documentation requirements.

Solution

We adapted the test systems, upgraded the existing platform, added new test sections and supported on-site installation, commissioning and acceptance documentation.

Result

The test systems have been delivered. The platform upgrade and the second line are in progress.

Battery Manufacturer · Thailand and India

Challenge

Battery models and line conditions differed between plants. Test equipment on two lines in Thailand had to be retrofitted within short shutdown windows, and a line moved from China to India had to be adapted and recommissioned.

Solution

We reused the existing hardware platform and adapted fixtures, software configuration and test items for each battery model and plant.

Result

The Thailand retrofits have been delivered, and the India line is in progress.

Planning a New Line or an Upgrade?

Tell us about your product and capacity targets, and our engineers will help you plan the line.